Hbts40r Hbts60r Hot Sale Construction Diesel Engine Concrete Pump for Floor Screed
HENAN SHENGMAO MACHINERY CO., LTD.- Type:Concrete Pump
- Shotcrete Type:Wet
- Productivity:60m3,H
- Certification:ISO9001: 2000, CE
- Condition:New
- Max. Delivery Capacity (L/H) (M 3 /H):82,48
Base Info
- Model NO.:HBTS60
- Main Hydraulic Pump Brand:Flutek Kawasaki
- Max. Pumping Pressure (L/H) (MPa):7,13
- Delivery Pipe Diameter (mm):125
- Diesel Engine Brand:Weihai Wendeng
- Motor Power (Kw):90
- Max. Delivery Distance (V/H) (M):160,800
- Max. Aggregate Diameter (mm):50
- Total Weight (Kg):7200
- Transport Package:Container Transportation
- Specification:5900*2000* 2260
- Trademark:shengmao
- Origin:China
- HS Code:8413400000
- Production Capacity:100sets,Year
Description
Basic Info.
Model NO. HBTS60 Main Hydraulic Pump Brand Flutek Kawasaki Max. Pumping Pressure (L/H) (MPa) 7/13 Delivery Pipe Diameter (mm) 125 Diesel Engine Brand Weihai Wendeng Motor Power (Kw) 90 Max. Delivery Distance (V/H) (M) 160/800 Max. Aggregate Diameter (mm) 50 Total Weight (Kg) 7200 Transport Package Container Transportation Specification 5900*2000* 2260 Trademark shengmao Origin China HS Code 8413400000 Production Capacity 100sets/YearProduct Description
Product descriptionConcrete pump is used to deliver concrete to the job site above ground or underground, such as high-rise buildings or tunnel construction. Our concrete pump can deliver concrete to about 200 meters in height and 300 meters in length.
We use world-famous brand for the main parts of our concrete pump which can ensure the performance of the machine. Such as the Korean Kawasaki oil pump, Italy Manuli hydraulic hose, Japanese OMRON PLC, USA Parket seal, France Schneider electrical elements, etc.
All our concrete pumps are equipped with wheels and remote control, it is very easy to operate and move to other job sites.
Currently, we have 30m3/h to 90m3/h electricity powered or diesel-powered concrete pump for you to choose. Welcome to contact us for details and quotations.
Concrete Pump Diesel Type
Model | HBTS40R | HBTS60R | HBTS80R | HBTS90R |
Max.Dlivery Capacity(L/H)(m3/h) | 40/26 | 61/37 | 84/45 | 95/55 |
Main Hydraulic Pump Brand | Flutek Kawasaki | Flutek Kawasaki | Flutek Kawasaki | Flutek Kawasaki |
Max.Pumping pressure(L/H)(MPa) | 7.6/10 | 7/12 | 7.6/16 | 9.3/18 |
Delivery Pipe Diameter(mm) | 125 | 125 | 125 | 125 |
Diesel Engine Brand | Weichai | Weichai | Weichai | Weichai |
Diesel Engine Power(KW) | 82 | 129 | 140 | 176 |
Max.Dlivery Distance(V/H)(m) | 120/500 | 120/500 | 160/800 | 360/1200 |
Max.aggregate Diameter(mm) | 40 | 40 | 50 | 50 |
Overall Size(mm) | 5000*1850*1700 | 4820*1750*1770 | 6000*2160*2600 | 6000*2200*2250 |
Total Weight(kg) | 5500 | 7200 | 7700 | 8200 |
model | HBTS40 | HBTS50 | HBTS60 | HBTS80 |
Max.Dlivery Capacity(L/H)(m3/h) | 40/23 | 62/27 | 82/48 | 101/61 |
Main Hydraulic Pump Brand | Flutek Kawasaki | Flutek Kawasaki | Flutek Kawasaki | Flutek Kawasaki |
Max.Pumping pressure(L/H)(MPa) | 7.6/10 | 7.3/12 | 7/13 | 8.3/16 |
Delivery Pipe Diameter(mm) | 125 | 125 | 125 | 125 |
Motor Brand | Weihai wendeng | Weihai wendeng | Weihai wendeng | Weihai wendeng |
Motor Power(KW) | 45 | 55 | 90 | 110 |
Max.Dlivery Distance(V/H)(m) | 120/500 | 120/500 | 160/800 | 160/800 |
Max.Aggregate Diameter(mm) | 40 | 40 | 50 | 50 |
Overall Size(mm) | 4500*1750*1600 | 5200*2000*2260 | 5900*2000*2260 | 6000*2100*2250 |
Total Weight(kg) | 4700 | 5500 | 7200 | 7700 |
After-sales Service
1. Provide 7 * 24 hours online after-sales service every week
2. Provide relevant certificates, customs clearance documents, operation and maintenance instructions, installation videos, etc.
3. Dispatch after-sales engineers to install and commission equipment abroad, and provide free training for operators and maintenance personnel for operation and maintenance
4. Establish a complete customer profile, regular inspections, regular visits, free maintenance services and technical
improvements
5. Equipped with a spare parts warehouse, you can guarantee the fast supply of all accessories. During the warranty period, the parts required for equipment damage will be borne by the company, the customer does not have to pay any fees