Engineering & Construction Machinery

Hydraulic Motor Valve Spare Parts

Hangzhou PinXin Hydraulic Technology Co., Ltd.
  • Type:Motor
  • Application:Excavator
  • Certification:ISO9001: 2000
  • Condition:New
  • Material:Carbon Steel
  • Usage:Oil

Base Info

  • Model NO.:valve
  • Apply to:Excavator
  • Transport Package:Box or Customer Requirements
  • Trademark:PX
  • Origin:China
  • HS Code:8413606090
  • Production Capacity:500 Pieces,Month

Description

Basic Info.

Model NO. valve Apply to Excavator Transport Package Box or Customer Requirements Trademark PX Origin China HS Code 8413606090 Production Capacity 500 Pieces/Month

Product Description

Our Advantage
1. There are lots of available series hydraulic pump in stock.
2. We are professional supplier of hydraulics.
3. Our factory has more than 10 years exprience in hydraulic industry.
4. Our factory is closed to Shanghai port & Ningbo port

Applied for
Hydraulic Motor Valve Spare Parts

Hydraulic Motor Valve Spare Parts



Packaging & Shipping
Hydraulic Motor Valve Spare Parts


Hydraulic Motor Valve Spare Parts

FAQ

Payment term:

1. T/T: 30% deposit by T/T, 70% balance by T/T before shipment

2. L/C at sight

Trade term: EXW or FOB Ningbo/Shanghai

Packing details:

Eternal Brand, Neutral or Customer's requires packing 

Neutral carton or same as the Customer's requires, export standard carton

All cartons should be packed into the pallets more carefully.

All of the productions are inspected carefully one by one by QC before delivery.

Delivery time:

We have huge quantity of inventory for complete pumps, motor and some pare pats, 
so the leading time is within 3days if have in stock. 
If haven't, within 5days if the quantity is less than 50pcs. 
It depends on the quantity ordered.

Min. Order:
If the model is in common or the production are in our stock warehouse, 
No MOQ for stocking production.Larger quantity, price will be more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It's door to door or barn to the door,
usually 5-7 days to arrive.

By air to air port, usually 3-5 days to arrive

By sea to sea port, usually 20-30 days to arrive.

If your deliever time is very urgent, we suggest that you choose by courier or air.

If not, it's very cheap to by sea.

CONTACT US