
PC200 Excavator Track Shoe for Komatsu
Liaoan Machinery Co., Ltd.- Type:Track Shoe
- Application:Excavator
- Certification:ISO9001: 2000
- Condition:New
- Colour:Yellow or Black
- Pitch:190mm
Base Info
- Model NO.:PC200
- Thickness:8.5-10mm
- Material:25mnb, 25crmnb, 40mnb
- Hardness:42-49 HRC
- Warranty Time:One Year
- Length:on Your Requirement
- Customized:Available
- Lead Time:10-15 Days After Payment
- Transport Package:Fumigating Wood Pallet with PE Film
- Specification:STEEL
- Trademark:LLA
- Origin:P. R. China
- HS Code:84314999
- Production Capacity:Annal 150000 Ton
Description
tem No.Series No. weight DIMENSION MODEL kg A BPC60-3,S50,D20,65 2 3135E-400 4.36 135 12.5EX100-1/2/3/5,EX120-1/3,DH120 E120B CAT312 CAT215 4 3171C-500 12.4 170.7 16.3 57 86.4 102.4 28.5 72 34.5 500 198.9 9.5 PC100-5/6 PC120-5/6 PC130-6 5 3188A-600 17.32 187.9 20.45VOLVO210 6 3190B-600 16.88 190 18.5EX200-2/5EX210PC200-2/3 ZAX230 EX220 7 3190D-800 22.5 190 18.5E200B,EL200B,E320C ,SK200,200,340,SH200,SK230 9 3190F-800 22.5 190 20.85 PC300-5/1/3,DH280,DH320,VOLVO290,EX300-3 11 3203A-700 22.26 203 20.5E325ST,SK300 14 3216B-600 25.23 216 22.8VOLVOEC360BLC,EC460,PC300HD,PC400,EX400,PC360,WY160,E345 PC400-3 PC300-5 15 3216B-700 29.44 216 22.8VOLVOEC360BLC,EC460,PC300HD,
PC400-3,EX400,PC360,WY160,E345 16 3216B-800 33.64 216 22.8 76.2 146 184 37 146 44 800 247 14 17 3154A-450 6.49 154 14.25PC60-7 18 3171.5B-600 12.76 171.5 16.5 60.4 108 108 30.1 110 34.5 600 190 9.5 E120 SK120-3
Working process & Testing equipments

Delivery solution

Packaging
1. Packed on furmigating pallet with PE film, which is advoid from moisture.
2. Steel strip tighten track shoe and pallet.
3. Shipping port: Dalian port
4. Air port: Dalian, Beijing.
Shipping
Lorry Fleet: There is a specialized lorry fleet provide transportation service.
Delivery period: 15-20 days after order and advanced payment.
After Service:
Management of Customer Complaints
Highly Attention and Quick Processing Result in 24hours.
Negociating the solutions.
How to Place the Order
PC400-3,EX400,PC360,WY160,E345
Working process & Testing equipments

Delivery solution

Packaging
1. Packed on furmigating pallet with PE film, which is advoid from moisture.
2. Steel strip tighten track shoe and pallet.
3. Shipping port: Dalian port
4. Air port: Dalian, Beijing.
Shipping
Lorry Fleet: There is a specialized lorry fleet provide transportation service.
Delivery period: 15-20 days after order and advanced payment.
After Service:
Management of Customer Complaints
Highly Attention and Quick Processing Result in 24hours.
Negociating the solutions.
How to Place the Order
* Tell us machine model, track shoe model or drawings.
* We send quotation to you. If need testing report, I will send you by email.
* If the price and parameter is OK, payment in advance.
* We start to manufacturing track shoe.
* When goods is done, we take photo for your check, and then pay the balance.
* We delivery the courier company.