
Shantui Construction Machinery 220HP SD22 Chinese Bulldozer for Africa
Mafal (Shanghai) Machinery Limited- Type:Universal Type
- Transmission:Hydraulic Transmission
- Walking Mode:Crawler
- Load and Unload Method:Front Discharge
- Engine Power:147~515kw
- Certification:CE, ISO9001: 2000
Base Info
- Model NO.:SD22
- Condition:New
- Color:Orange
- Operating Weight (Ripper Not Included):23.4t
- Gradeability:30
- Blade Type:Straight Tilt Blade U-Blade
- Blade Width:Semi-U Blade 3725X1374
- Ma× Drop Below Ground of Blade:540mm
- Ripper Type:Three-Shank Ripper
- Number of Carriers:2
- Track Gauge:2000mm
- Pitch:216mm
- Transport Package:Nude
- Specification:70CBM
- Trademark:MAFAL
- Origin:Jining
- HS Code:84291990
- Production Capacity:200units
Description
NT855-C280S10
Semi-U blade Angle blade
U blade 3800×1343
Semi-U blade 3725×1374
Angle blade 4365×1055
U blade 7.5
Semi-U blade 7.0
Angle blade 4.7
Three-shank ripper 666
Three-shank ripper 555
km/h


1.. Which countries do we export to?
Asia: Vietnam, India, Indonesia, Pakistan, Kazakhstan, Uzbekistan, etc.
Europe: Russia, Belarus, Ukraine, Lithuania, Saudi Arabia, etc.
South America: Brazil, Chile, Paraguay, Argentina, etc.
Africa: South Africa, Ethiopia, Libya, Ghana,Algeria,Nigeria,Congo,Mozambique ,Kenya etc.
2.What are our advantages compared with other manufacturers/factories?
1)Reliable Quality: Carefully select regular manufacturers for supporting spare parts,like engines,bridge,transmissions,and many parts designed and produced by ourselves,
always adapting the best materials.
2)Competitive Price: Concentration of mechanized production in large quantities reduce
production cost to ensure that our price is competitive.
3)Service Team: First, our sales managers are online 24 hours,ready to answer your
questions at any time. Second, professional maintenance team with senior technicians,
ready to provide support services to users and dealers. Most problems can be solved
within 24 hours.
4)Fast Delivery:Under normal circumstances,we can delivery with 10 working days in
factory after receiving pre-payment.
3.Which payment terms can we accept?
Normally we can work on T/T or L/C.
1)On T/T term, 30% payment is required in advance for production, 70% balance shall
be paid before delivery or against the copy of original B/L for old long cooperation clients.
2)On L/C term, 100% irrevocable L/C at sight without "soft clauses" can be accepted.
4. How long is the validity of our quotation?
As a reliable supplier, basically our price remains stable through one year, we only adjust
our price based on two situations:
1)The rate of USD
2)TheThe price of material
Other questions, please contact me directly!!