Engineering & Construction Machinery

Steel Floor Decking Roll Forming Machine

Hangzhou WILLING INTERNATIONAL CO., LTD.
  • Controller:PLC
  • Total Weight:About 18000kg
  • Max. Forming Speed:8-12 M,Min
  • Roller Material:45#Steel with Chrome Treatment
  • Transport Package:Sea Worthy Packed in The Container
  • Specification:CE Standard, ISO 9001: 1008

Base Info

  • Model NO.:WLFM76-344-688
  • Trademark:WILLING INT
  • Origin:China
  • HS Code:84552210
  • Production Capacity:150 Sets Per Year

Description

Material specificationAluzinc steel and galvanized steel.Thickness0.8 mm to 1.5mm.Main motor power18.5 kw.Hydraulic station power4 kw.Yield stress235Mpa (33KSI) ~ 350Mpa (50KSI).Roll forming speed12 m/minute.Cutting tolerance+/-2.5mm(length≤5000mm); +/-3.0mm(5000mm<length≤10000mm).Manual uncoilerMax. Capacity: 8'000kgs.VoltageAs per customer's request.Numbers of stations25 stations.Type of cuttingRoll-formed and length-set profile cutting. 
3.Material of Main Equipment:Roller MaterialHigh grade S45C forged steel, coated with hard chrome.Active Shaft MaterialHigh grade S45C carbon wrought steel, diameter 85mm.Electric ElementsPLC control console, touch screen and transducer, from Mitsubishi, Japan.
Other elements, from Schneider Electric, Germany.Cutter bladesCr12MoV steel with quenched treatment, hardness HRC58~61,
wear-resistance, good steel structure, long life.
5.Standard Equipment of Machine:1)Manual Uncoiler1set2)Infeed Guide1set3)Roll Forming Station1set4)Post-cut Equipment1set5)Hydraulic Station1pc6)PLC Control Console1pc7)Product Support Table2pcs8)Spare Parts1box
Process Sketch:
Uncoiling →Infeed guiding →Roll forming →Pressing→Measure Length&Shearing →Sheet to Support Table

Packaging & Shipping

1.One 20ft container for loading one set machine with manual decoiler;
2.The whole Wiped Anti Rust Oil, PLC controller covered by foam film; 
3.Spare parts and some small parts packed in plastic tooling box; 
4.All Components Fixed by steel wire with Container.
FAQ
Q:Are you a manufacturer?
A:Yes absolutely. Welcome a lot for your visiting to us.
Q:What's the delivery time?
A:Normaly will take 60days
Q:Do you have after-sale support?
A:Yes, we're always here for giving you advice and support for technical details since we have senior technician. 
Q:Is there quality control when manufacturing the lines?
A:Yes, we have a group of team who will be responsible for quality control from laying off the raw material, processing the rollers and the other parts, make treatment on the roller surface and shaft, assembling, testing and packaging.