Engineering & Construction Machinery

China Supply Hydraulic Piston Pump A11V Series A11vlo130+A11vlo130+A11vo60

Hangzhou PinXin Hydraulic Technology Co., Ltd.
  • Type:Pistons
  • Application:Paving Machinery
  • Certification:CE
  • Condition:New
  • Apply:Hydraulic Pump
  • Apply for:Crawler Crane

Base Info

  • Model NO.:A11VLO Series
  • Usage:Oil
  • Apply to:Drilling Rig
  • Transport Package:Box or Carton
  • Specification:A10VG
  • Trademark:PX
  • Origin:China
  • HS Code:8481201000
  • Production Capacity:1000pieces,Month

Description

Basic Info.

Model NO. A11VLO Series Usage Oil Apply to Drilling Rig Transport Package Box or Carton Specification A10VG Trademark PX Origin China HS Code 8481201000 Production Capacity 1000pieces/Month

Product Description

Our Advantage
1. There are lots of available Hydraulic control valve in stock.
2. We are professional supplier of hydraulics.
3. Our factory has more than 10 years exprience in hydraulic industry.
4. We can provide fast logistics services

Real shooting:

China Supply Hydraulic Piston Pump A11V Series A11vlo130+A11vlo130+A11vo60
China Supply Hydraulic Piston Pump A11V Series A11vlo130+A11vlo130+A11vo60

Application:
China Supply Hydraulic Piston Pump A11V Series A11vlo130+A11vlo130+A11vo60


Package:
China Supply Hydraulic Piston Pump A11V Series A11vlo130+A11vlo130+A11vo60

Delivery:
China Supply Hydraulic Piston Pump A11V Series A11vlo130+A11vlo130+A11vo60

Contact us:

Packing details:

Neutral carton or same as the Customer's requires, export standard carton

All cartons should be packed into the pallets more carefully.

All of the productions are inspected carefully one by one by QC before delivery.

Delivery time:

We have huge quantity of inventory for complete pumps, motor and some spare parts, 
so the leading time is within 3days if have in stock. 
If haven't, within 5days if the quantity is less than 50pcs. 
It depends on the quantity ordered.

Min. Order:
If the model is common or the production in our stock warehouse, there is No MOQ for stocking production.
Larger quantity, price will be more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It's door to door or barn to the door,
usually 5-7 days to arrive.

By air to air port, usually 3-5 days to arrive

By sea to sea port, usually 20-30 days to arrive.

If your deliever time is very urgent, we suggest that you choose by courier or air.

If not, it's very cheap to by sea.