Engineering & Construction Machinery

XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll

Xuzhou Construction Machinery Group Import & Export Co., Ltd.
  • Type:Crawler Excavator
  • Usage:Special Excavator, Marine Excavator, Mining Excavator, GM Excavator
  • Bucket:Grab Shovel
  • Transmission:Hydraulic Transmission
  • Drive Type:Electric Drive
  • Bucket Capacity:0.5~1.0m³

Base Info

  • Model NO.:XE215CLL
  • Size:Medium-Sized
  • Certification:CE, ISO9001: 2000
  • Condition:New
  • Max. Digging Height:13250mm
  • Max. Dumping Height:10942mm
  • Max. Digging Depth:11690mm
  • Transport Package:Comply with Export Packaging Requirements
  • Specification:10760*3190*3280mm
  • Trademark:XCMG
  • Origin:Xuzhou, Jiangsu, China
  • HS Code:84295212
  • Production Capacity:10000 Units,Year

Description

4835
[Product Picture]
XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll
XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll

XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll
XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cllXCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll
[Company Information]
XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll
XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll
XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll
XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll
XCMG Excavation Construction Machine 21 Ton Hydraulic Crawler Excavator Xe215cll
[FAQ] 
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted.
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC.
3: What about the delivery time?
A: 7-30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.