Engineering & Construction Machinery

Steel Crawler Hydraulic Hammer Pile Driver Solar Ramming Machine

Ji Ning Hengwang Mining Machinery Co., Ltd.
  • After-sales Service:Yes
  • Warranty:Yes
  • Type:Vibration Piling Machine
  • Pressure Pile Driver Type:Hydraulic Pile Driver
  • Pile Hammer Type:Hydraulic Hammer
  • Power Source:Diesel

Base Info

  • Model NO.:HW400
  • Motor Power:85kw
  • Noise:With Noise
  • Certification:CE, ISO 9001:2000
  • Condition:New
  • Product Number:Hwl400r
  • Hydraulic Hammer Model (mm):75,85,100 Optional
  • Walking Motor Torque (N.M):<11500
  • Frame Rotation Angle (°):360
  • Hydraulic System Pressure (MPa):22
  • Traveling Speed (Km/H):3
  • Vehicle Weight (Kg):6200
  • Engine Power (Kw):85
  • Engine Rated Speed (R/Min):2600
  • Track Shoe Width (mm):350
  • Track Single (Section):42
  • Total Displacement of Walking Motor (Ml/:53
  • Rated Pressure of Walking Motor (MPa):30
  • Travel Motor Reduction Ratio:1:54.4
  • Transport Package:Standard Packaging
  • Specification:4420*1920*4900-7900mm
  • Trademark:HW
  • Origin:China
  • Production Capacity:300sets,Month

Description

Product number

HWL400R

Hydraulic hammer model (mm)

75/85/100 optional

Hydraulic hammer flow (L/min)

50-110

Impact frequency (bmp)

350-800

Drill rod diameter (mm)

75/85/100

Walking motor torque (N.m)

<11500

Pile height (mm)

According to the slide

Sliding guide frame inclination angle (°)

(Left) 5(Right) 5

Frame rotation angle (°)

360

Hydraulic system pressure (mpa)

22

Gear pump displacement (ml/r)

40+40+25

Traveling speed (km/h)

3

Vehicle weight (kg)

6200

Engine power (kw)

85

Engine rated speed (r/min)

2600

Track shoe width (mm)

350

Track single (section)

42

Total displacement of walking motor (ml/r)

53

Rated pressure of walking motor (mpa)

30

Travel motor reduction ratio

1:54.4

Dimensions (mm)

 

4420*1920*4900-7900(working state)4500-7500*1920*2800(transportation status)


Steel Crawler Hydraulic Hammer Pile Driver Solar Ramming MachineSteel Crawler Hydraulic Hammer Pile Driver Solar Ramming MachineSteel Crawler Hydraulic Hammer Pile Driver Solar Ramming MachineSteel Crawler Hydraulic Hammer Pile Driver Solar Ramming Machine

Steel Crawler Hydraulic Hammer Pile Driver Solar Ramming Machine
FAQ
Q:Are you manufacturer? A: Yes, we are factory with more than 20 years of manufacturing experience.

Q:What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and
packagesbefore you pay the balance.

Q:What is the warranty of our machine?
A:Our main machine enjoys a 1 year warranty, during this time all accessories broken can be changed
for anew one.And we provide videos for machine install and operation.

Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is
according to quantity.

Q:How do you make our business long-term and good relationship?
A:We keep good quality and competitive price to ensure our customers benefits;

Q:Do you have any certificates for your machine?
A: All of our products coming with the certificates of CE, IS09001.