Engineering & Construction Machinery

Hydraulic Piston Motor A6vm160ep2 A6vm160ep2d for Crewler Crane

Hangzhou PinXin Hydraulic Technology Co., Ltd.
  • Type:Motor
  • Application:Excavator
  • Certification:CE, ISO9001: 2000, BV
  • Condition:New
  • Apply for:Crawler Crane
  • Apply to:Paver

Base Info

  • Model NO.:A6vm160ep2 A6vm160ep2d
  • Material:Cast Iron
  • Usage:Oil
  • Power Type:Hydraulic
  • Transport Package:Standard Export Package
  • Specification:A6VE160
  • Trademark:PX
  • Origin:China
  • HS Code:8412291000
  • Production Capacity:500pieces,Month

Description

Basic Info.

Model NO. A6vm160ep2 A6vm160ep2d Material Cast Iron Usage Oil Power Type Hydraulic Transport Package Standard Export Package Specification A6VE160 Trademark PX Origin China HS Code 8412291000 Production Capacity 500pieces/Month

Product Description

Our advantages:
1. There are lots of available A6VM series hydraulic piston motor in stock.
2. We are professional supplier of hydraulics.
3. Our factory has more than 10 years exprience in hydraulic industry.
4. Our factory is closed to Shanghai port & Ningbo port.


Product show:
Hydraulic Piston Motor A6vm160ep2 A6vm160ep2d for Crewler Crane

Field of application:

Hydraulic Piston Motor A6vm160ep2 A6vm160ep2d for Crewler Crane
Hydraulic Piston Motor A6vm160ep2 A6vm160ep2d for Crewler Crane


Package:
Hydraulic Piston Motor A6vm160ep2 A6vm160ep2d for Crewler Crane
Delivery:

Hydraulic Piston Motor A6vm160ep2 A6vm160ep2d for Crewler Crane

Delivery time:

We have huge quantity of inventory for complete pumps, motor and some spare parts, 
so the leading time is within 3days if have in stock. 
If haven't, within 5days if the quantity is less than 50pcs. 
It depends on the quantity ordered.

Min. Order:
If the model is common or the production in our stock warehouse, there is No MOQ for stocking production.
Larger quantity, price will be more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It's door to door or barn to the door,
usually 5-7 days to arrive.

By air to air port, usually 3-5 days to arrive

By sea to sea port, usually 20-30 days to arrive.

If your deliever time is very urgent, we suggest that you choose by courier or air.

If not, it's very cheap to by sea.