Mini Hot Mix Drum Mobile Small Concrete Asphalt Plant 40t/H
Oriemac Machinery & Equipment (Shanghai) Co., Ltd.- Type:Concrete Mixing Plant
- Shotcrete Type:Wet
- Machining Process:Vacuum
- Structure:Rotor Type
- Productivity:40t,H
- Feeding Height:3
Base Info
- Model NO.:DHB40
- Vibrating Amplitude:6m
- Certification:ISO9001: 2000, CE
- Condition:New
- Color:Orange
- Capacity:40 Tons Per Hour
- Diesel Consumption:5.5-7.0 Kg ,Ton
- Installation Power:75kw
- Electrical Design:220V,380V-50Hz(Adjustable According to Local Volta
- Transport Package:Nude Packing
- Specification:30*16*6m
- Trademark:LY
- Origin:China
- HS Code:84743200
- Production Capacity:100 Units,Month
Description
DHB40
Model
DHB40 Asphalt Mixing Plant
Type
Continuous Hot Mix
40 Tons Per Hour
Capacity
40 Tons Per Hour (Standard Working Condition)
1200*5000mm
Drying & Mixing Drum
5.5-7.0kg/ton
Fuel Consumption
diesel consumption: 5.5-7.0 kg /ton
0.5%0.3%
Weighing Precision
hot aggregate: 0.5%; bitumen: 0.3%
130-165
Hot Asphalt Temperature
130-165(adjustable)
100mg/Nm
Air Emissions
70db(A)
Working Noise
Operation
Full Auto/Manual Operation
75kw
Installation Power
220V/380V-50Hz ()
Electrical Design
220V/380V-50Hz(adjustable according to local voltage)
30166
Plant Covering Area
Length:15.6m, width:15m, max. height point: 6m
Documents
Lay-Out/ Electric Circuit Diagram; Chinese-English Operation Manual; Qualification Certificate

1. Cold aggregate feeder 2. Bitumen tank 3. Burner 4. Drying & mixing drum
5. Hot asphalt elevator 6. Hot asphalt silo 7.Control cabin 8. Water dust filter




Payment Terms: T/T or L/C; 30% advanced payment, 70% balance payment before shipping.
Delivery Time: 15-20 working days after receiving advanced payment.
Warranty: 12 months after erecting the whole plant.
Packing: It totally needs 4 set *40 HQ containers by shipping.
Erection/commissioning/training:
1) The buyer should prepare the earthwork, electrical power supply etc based on the seller's technical drawings, and prepare professional worker-team, include: electrical workers, welding workers, maintenance workers, operators, also necessary working tools as truck crane etc.
2) The seller should send 1 engineer to guide erection in the buyer's working site, and training operators for the buyer.
3) The buyer should bear accommodation, go and return air tickets, local transportation fees, medical care; and allowance USD80/day for each person, and assist the seller's to get the Visa.
4) General erection time is about 15-20 working days.