
0.91cbm Shovel Bucket 21ton Track Type Crawler Excavator
Henan Haiheng Import and Export Co., Ltd.- Type:Crawler Excavator
- Usage:GM Excavator
- Bucket:Shovel
- Transmission:Hydraulic Transmission
- Drive Type:Internal Combustion Drive
- Bucket Capacity:0.5~1.0m³
Base Info
- Model NO.:XE215C
- Size:Large-Scale
- Certification:CE, ISO9001: 2000
- Condition:New
- Working Weight:21500kg
- Max. Digging Depth:6655mm
- Max. Working Height:9640mm
- Max. Working Radius:9925mm
- Rated Speed:5.5,3.3km,H
- Rated Output Power:106.5kw,1950rpm
- Transport Package:Nuld Packing
- Specification:CE, ISO
- Trademark:CHHGC
- Origin:China (Mainland)
- HS Code:84295212
- Production Capacity:1000 Units,Year
Description
ModelXE215C Bucket capacity m³ 0.91 Standard bucket width mm Operating weight kg 2, 1500 Dimension (in transportation) Overall length mm 9, 520 Overall width mm 2, 990 Overall height mm 2, 985 Min. ground clearance mm 485 Engine Model ISUZU BB-6BG1TRP Total displacement L 6.494 Rated output power KW/rpm 106.5/1950 Digging performance Max. digging height mm 9, 640 Max. dumping height mm 6, 800 Max. digging depth mm 6, 655 Max. vertical digging depth mm 5, 695 Max. digging radius mm 9, 925 Boom deflection angle: left/right ° Min. slew radius mm 3, 530 Min. rear slew radius mm 2, 750 Bucket digging force kn 138 Track type Steel Track width mm 600 Travel system Track overall length mm 4, 255 Wheel base mm 3, 462 Track gauge mm 2, 390 Travel speed (Gear I/II) km/h 5.5/3.5 Gradeability % 70 Slew speed rpm 13.3 Bulldozing plate Bulldozing plate (width) mm Bulldozing plate (height) mm Lifting distance (GL up/down) mm Hydraulic pump type Piston pump×2 Fuel tank capacity L 360 Hydraulic oil tank capacity L 220
Our Products

Production Workshop

Certificates


Business Partners

FAQ
1. How is your price compared with manufacturers/factories?
We work as the leading dealers of various leading China construction machinery manufacturers/factories, and are constantly treated with best dealership price. From numerous comparison and feedbacks from clients, our price is more compettive than the price from manufacturers/factories.
2. How is your delivery time?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/factories, it will take more than 30 days to produce the ordered machine.
3. How soon can you respond client inquiries?
Our team is consisted of a group of diligent and dynamic people, working 24/7 to respond client inquiries and questions all the time. Most problems can be solved within 8 hours, while manufactures/factories will take much longer to give response.
4. Which payment terms can you accept?
Normally we can work on T/T term or L/C term, sometime DP term.
(1) On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment, or against the copy of original B/L for long-term cooperating client.
(2) On L/C term, a 100% irevocable L/C without "soft clauses" from an international recognized bank can be accepted. Please seek the advice from the individual sales manager whom you work with.
5. How long will your price be valid?
We are a tender and friendly supplier, never greedy on windfall proft. Basically, our price remains stable through the year. We only adjust our price based on two situations:(1) The rate of USD: RMB varies significantly according to the international currency exchange rates; (2) Manufacturers/factories adjusted the machine price, because of the increasing labor cost and raw material cost.
6. What logistics ways you can work for shipment?
We can ship construction machinery by vanious transportation tools.
(1) For 80% of our shipment, the machine will go by sea, to all main continents such as Africa, South America, Middle East, Oceania and Southeast Asia etc, either by container or RoRo/Bulk shipment.
(2) For inland neighborhood countries of China, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, T ajkistan, Uzbekistan, Turkmenistan etc., we can send machines by road or railway.
(3) For light spare parts in urgent demand, we can send it by intemational courier service, such as DHL, TNT, UPS, or Fedex.
Our Products

Production Workshop

Certificates


Business Partners

FAQ
1. How is your price compared with manufacturers/factories?
We work as the leading dealers of various leading China construction machinery manufacturers/factories, and are constantly treated with best dealership price. From numerous comparison and feedbacks from clients, our price is more compettive than the price from manufacturers/factories.
2. How is your delivery time?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/factories, it will take more than 30 days to produce the ordered machine.
3. How soon can you respond client inquiries?
Our team is consisted of a group of diligent and dynamic people, working 24/7 to respond client inquiries and questions all the time. Most problems can be solved within 8 hours, while manufactures/factories will take much longer to give response.
4. Which payment terms can you accept?
Normally we can work on T/T term or L/C term, sometime DP term.
(1) On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment, or against the copy of original B/L for long-term cooperating client.
(2) On L/C term, a 100% irevocable L/C without "soft clauses" from an international recognized bank can be accepted. Please seek the advice from the individual sales manager whom you work with.
5. How long will your price be valid?
We are a tender and friendly supplier, never greedy on windfall proft. Basically, our price remains stable through the year. We only adjust our price based on two situations:(1) The rate of USD: RMB varies significantly according to the international currency exchange rates; (2) Manufacturers/factories adjusted the machine price, because of the increasing labor cost and raw material cost.
6. What logistics ways you can work for shipment?
We can ship construction machinery by vanious transportation tools.
(1) For 80% of our shipment, the machine will go by sea, to all main continents such as Africa, South America, Middle East, Oceania and Southeast Asia etc, either by container or RoRo/Bulk shipment.
(2) For inland neighborhood countries of China, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, T ajkistan, Uzbekistan, Turkmenistan etc., we can send machines by road or railway.
(3) For light spare parts in urgent demand, we can send it by intemational courier service, such as DHL, TNT, UPS, or Fedex.