Engineering & Construction Machinery

Guardrail Installation Hydraulic Pile Driver

Ji Ning Hengwang Mining Machinery Co., Ltd.
  • Type:Vibration Piling Machine
  • Pressure Pile Driver Type:Hydraulic Pile Driver
  • Pile Hammer Type:Drop Hammer
  • Motor Power:55kw
  • Noise:With Noise
  • Certification:ISO 9001:2000

Base Info

  • Model NO.:HW
  • Condition:New
  • Piling Speed(M/Min):1-2m,Min
  • Min Ground Interspace:380mm
  • Main Valve Flow:100L,Min
  • Drilling Diameter:130-800mm
  • Climb Angle:35
  • Rated Speed:2400r,Min
  • Max Drill Depth:3600mm
  • Max Travel Speed:5km,H
  • Rated Power:55kw
  • Weight:7200kg
  • Transport Package:Wooden Case
  • Specification:CE
  • Trademark:HW
  • Origin:Shangdong China
  • HS Code:8430100000
  • Production Capacity:5000set,Year

Description

                                              hydraulic screw and vibratory hammer pile driver for solar projectModelHWZGX-390LHammer Model390Rod Diameter /mm0-400Duplex gear pump pressure(mpa)20Duplex gear pump displacement(ml/r)40hydraulic system pressure(mpa)20Overall Machine weight /T5.8diesel engine (kw)85rotation angle /°360rotation semi diameter/mm1925Effective press pile stroke/mm0-4000dimension(L*W*H)/mm4650*215082700track shoe(mm)350Walking motor total emissions (ml/n)1575Walking motor rated pressure (mpa)18walking motor output torque(n.m)4300walking motor rotation(r/min)50
Detailed Images
Guardrail Installation Hydraulic Pile Driver
Weichai engines, strong driving force, low fuel consumption, high economic.

Guardrail Installation Hydraulic Pile Driver
this hammer used for pressing the pile into the soil.
Guardrail Installation Hydraulic Pile Driver
Function 1:this hammer can drill the hard rock with air compressor.
Function 2:this hammer can drill the soil with the screw pipe.
Guardrail Installation Hydraulic Pile Driver


Working Practice
Guardrail Installation Hydraulic Pile Driver
Guardrail Installation Hydraulic Pile Driver
Guardrail Installation Hydraulic Pile Driver
Packing & Delivery

Guardrail Installation Hydraulic Pile Driver
Our Company

Shandong Hengwang Group Co.,Ltd

Shandong Hengwang Group co.,ltd is the professional manufacturer of pile driver. With more than 300 workers and 25 Senior engineers,high quality produts and best after sales service can both be guaranteed. main clients are around Southeast Asia,Mid East and South America. Welcome visit our factory and sent inquiry to us.

Guardrail Installation Hydraulic Pile Driver
Guardrail Installation Hydraulic Pile Driver
Guardrail Installation Hydraulic Pile Driver

FAQ

MOQ,Payment,Loading port,price term,OEM


1.Payment : I:100% T/T
                     II:30% advaced and the balance paid before delivery
                     III:credit letter at sight
2.MOQ:1Pcs
3.Port of loading: Qingdao Port or others
4.Price term:FOB Qingdao price
5.OEM:we are pleased to be your OEM factory

Contact now

Action Now Contact us.


TRUST YOU WILL LIKE OUR DESIGNS & PRICE.

Maria ma
Mobile: : +8617686192378
Tel:+86-537-2886869